Transportation Engineering generator set installation

Abstract: the power supply and distribution system in the transportation engineering system is not only different from the power supply and distribution system of industrial and mining enterprises, but also different from the internal power supply and distribution system of the power system, and has some of its own characteristics

key words: installation of diesel generator set in traffic engineering Untitled Document the power supply and distribution system in traffic engineering system is not only different from the power supply and distribution system of industrial and mining enterprises, but also different from the internal power supply and distribution system of power system, and has some characteristics of its own. Load classification according to the requirements for power supply reliability and the political and economic impact of power interruption, the power load of the project is divided into two levels, and the loads of three major systems, fire protection, emergency lighting, etc. are classified as class I loads, while other loads are classified as class II loads

in order to ensure the power supply of important class I and class II loads unique to the expressway, the project is configured to use an external 10kV power supply as the main power supply, and self starting diesel generator sets are equipped on the low-voltage side to meet the power supply requirements of class I and class II loads. In terms of the selection of main equipment, we choose enterprises with good social reputation at home and abroad as our equipment suppliers to ensure that the equipment used in this project has good performance

for the diesel generator set of this project, we will adopt the products of Shenzhen saiwatt Power Technology Co., Ltd., its diesel engine adopts the products of Deutz company, the generator adopts the products of British new era company, and the control system adopts the products of British deep sea company. Its performance can meet the design requirements, and some technical parameters exceed the requirements of the bidding documents. The transformer and distribution cabinet are products of XJ Group Co., Ltd., whose performance and technical parameters can meet or exceed the requirements of the bidding documents. High and low voltage insulated wires and power cables are products of Zhengzhou second cable factory, whose performance and technical parameters can meet or exceed the requirements of the bidding documents. In terms of construction technology, we will adopt advanced construction technology, perfect management mechanism and effective organization to ensure the construction quality and meet the requirements of the owner. The specific technical implementation scheme is as follows: 1. Construction of grounding device. The grounding device works closely with civil engineering to ensure the buried depth of grounding body; When backfilling, fine soil should be filled first to ensure good grounding; Under the condition of high soil resistivity, the way of adding resistance reducing agent or adding grounding electrode to the borehole is adopted to ensure that the grounding resistance value meets the acceptance specifications and design requirements. The metal components of the grounding device shall be hot-dip galvanized. The grounding device of the substation should be closed around the substation house, and the grounding resistance should not be greater than 4 ohms. At least two parts of the foundation steel and grounding device of the high and low voltage distribution device, transformer, capacitor, UPS, diesel generator set, DC panel and other equipment in the substation have reliable connections. At least one grounding flat steel shall be led out from both ends of the low-voltage distribution panel. One section shall be reliably connected with the PE bus, and the other end shall be reliably connected with the grounding device. The PE bus and n bus in the low-voltage distribution panel shall be reliably connected in two places. 2. The laying of cables after the arrival of various control cables and power cables at the construction site, their specifications and models, length should be checked to see whether they meet the order length, whether the cable appearance is damaged, whether the port seal is good, and whether various technical conditions are complete. The electrical performance of various cables shall be tested as required, and the test results shall comply with relevant standards and specifications. During cable laying, place the cable reel on the paying off rack, lay the cable from the cable reel through the correct manual method, use roller guide to pull out the cable by hand from beginning to end, and do not use cable winch. During cable laying, all necessary measures shall be taken to prevent mechanical damage to the cable, and straw mats or other items shall be placed along the cable laying direction to prevent the cable from dragging on the ground to damage the cable. When the cable is laid in the embedded steel pipe, the following measures should be taken: the steel pipe should be smooth and free of burrs. Before cable laying, a cylindrical brush should be used to clean the steel pipe to remove burrs and dirt; The cable traction lubricant, such as the mixed glue of graphite powder and neutral soapy water, shall be used to brush on the cable surface to reduce the traction resistance; When the cable is laid through the steel pipe, a sheath shall be installed at the pipe orifice to prevent cable damage. All cable laying shall be consistent with national construction standards or applicable IEE line standards, especially the ratio of cable bending radius to cable outer diameter shall not be less than the value specified in national standards or applicable IEE line standards. Cables laid in steel pipes shall not be connected in pipes. We recalculate the actual length of the cable marked in the construction drawing according to the embedded and reserved as built drawings provided by the civil construction unit, consider the construction margin and the length of the joint cable, and the best choice of indoor insulation, calculate the length of each cable, and provide the cable manufacturer with the requirements of cable manufacturing length. Try to lay the cable in a whole reel to reduce the intermediate joints. The cables shall be laid neatly on the support to avoid crossing as much as possible, and the cables shall not be damaged when fixed; The cable shall not be laid on the convex part of the edge, and shall not be bent and twisted, so as to avoid damage to the cable. The cutting is completed through the rigid replacement of auxiliary tools. According to the specific conditions of the laying location, all cable routes shall be specified to leave an appropriate cable length near the cable terminals and joints. 3. Cable connection and terminal fabrication the connectors and terminal heads of power cables are crimped with hydraulic pliers, and operated by trained personnel with work license to ensure the crimping quality. The construction is carried out by heat shrinkable method to ensure the insulation and pressure resistance requirements. The joint and terminal of the control cable practice the concept of green development with practical actions. The cable nose adopts welding to ensure the quality of connection. The ambient temperature and air humidity shall meet the requirements when making the middle head and terminal head of all cables. At the cable joint, its mechanical and electrical performance shall be good to prevent mechanical damage and any possible vibration. The fasteners shall not have any mechanical deformation and shall not damage the conductor of the cable. 4. Equipment inspection after the equipment arrives at the site, it shall be unpacked and inspected in time, and the equipment, accessories, special tools, spare parts and accompanying technical documents shall be checked according to the packing list, and the certificate of conformity, factory trial operation records and factory test records of the equipment shall be checked; Confirm whether the equipment specifications, models and accessories are correct and complete, and collect and save the product instructions, certificate of conformity test reports, etc. According to the design